
5 Axis CNC
Home » Equipment – old »
Specifications
| X Axis Travel (Roller Way) | 620mm |
| Y Axis Travel (Roller Way) | 520mm |
| Z Axis Travel (Roller Way) | 460mm |
| Maximum Workpiece Size | 620mm |
| B Axis Tilting Table | -50° ~ + 110° |
| Siemens 840D Control Touchscreen | |
| Renishaw Tool Setter & Spindle Probe |
| C Axis Rotary Table Continuous | 0.001° x 360° |
| Table Diameter (Up to a Maximum) | 650mm |
| Maximum Table Loading | 300kg |
| Spindle RPM | 1200 |
| Dia. x 330mm | |
| Level 90° Tilted | |
| 60 Station Magazine |
Here’s is an example of how the AIMS Project helped SME Dunbar Race Engineering Ltd
“The AIMS technical team visited our comapny and guided us through the programming of a basic part to get used to some of the Hypermill standard tools and functionality. We then checked the software and machine were communicating as expected by machining a sample part.
This has given a good starting point to begin learning Hypermill and equipped us to start programming on our own with Hypermill support. The training and approach delivered by the AIMS expert met and exeeded our expections. His time proved very valuable to our company.”








