
SMEC Lathe
Home » Equipment – old »
Specifications
Swing Over the Bed | 680mm |
Swing Over the Cross Slide | 505mm |
Max Milling Diameter | 526mm |
Max Turning Length | 500mm |
Maximum Turning Length | 1,500mm |
Chuck Size | 380mm |
Bore Diameter Thru Spindle | 132mm |

Swing Over the Bed | 680mm |
Swing Over the Cross Slide | 505mm |
Max Milling Diameter | 526mm |
Max Turning Length | 500mm |
Maximum Turning Length | 1,500mm |
Chuck Size | 380mm |
Bore Diameter Thru Spindle | 132mm |