
Equipment
Select the equipment type from the options below
We are currently updating our specifications, these will be published soon. In the meantime, if you have any queries about AIMS equipment, please email the team at aims@dumgal.gov.uk

Additive Manufacturing
Stratasys F120
Commercial grade polymer 3D Printer
Stratasys F370
Commercial grade polymer 3D Printer
Markforged Mark Two
Commercial grade high strength 3D Printer
Raise 3D Pro 3 Plus
Commercial grade printer capable of using food safe materials
Hexagon Bridge CMM
Equipment that measures the geometry of physical objects
Hexagon Absolute Romer Arm
7 Axis arm with a probe and scan system
Einscan 3D Scanner
Hand held 3D scanner
Leica BLK 360 G2
Next generation imaging laser scanner
Bambu Mini
Entry level hobbyist 3D printer (for courses only)

Collaborative Robots (Cobots) and Autonomous Robots
UR5e
Collaborative robot – works in conjunction with other machinery or an operative (Cobot)
UR10-CB
Collaborative robot – works in conjunction with other machinery or an operative (Cobot)
UR10e
Collaborative robot – works in conjunction with other machinery or an operative (Cobot)
MiR250
Mobile industrial robot (MiR) – autonomous mobile robot for low and high payload tasks

Welding
Lorch Welder
MIG & TIG cobot welding robotic system
Kemppi Welder
MIG & TIG cobot welding robotic system
Smooth Tool firmware
User friendly software that simplifies the programming of advanced welds

CNC Machining
Akira-Seiki 5 Axis CNC Machine
State of the art 5 Axis vertical machining centre that produces predominantly square parts (milling)
Haubex Automation System
Work holding system for small batches that transform the tool magazine into an automation system
SMEC Lathe
State of the art machining tool that produces round parts in a variety of different materials (turning)

Mixed Reality
Meta Quest 3
Virtual and augmented reality headset
Soldamatic Welding Simulator
Welding training solution powered by augmented reality