Close Menu
 

5 Axis CNC

Home » Services and Equipment » 5 Axis CNC

Specifications

X Axis Travel (Roller Way)620mm
Y Axis Travel (Roller Way)520mm
Z Axis Travel (Roller Way)460mm
Maximum Workpiece Size620mm
B Axis Tilting Table-50° ~ + 110°
Siemens 840D Control Touchscreen
Renishaw Tool Setter & Spindle Probe
C Axis Rotary Table Continuous0.001° x 360°
Table Diameter (Up to a Maximum)650mm
Maximum Table Loading300kg
Spindle RPM1200
Dia. x 330mm
Level 90° Tilted
60 Station Magazine

Gallery

Here’s is an example of how the AIMS Project helped SME Dunbar Race Engineering Ltd

“The AIMS technical team visited our comapny and guided us through the programming of a basic part to get used to some of the Hypermill standard tools and functionality. We then checked the software and machine were communicating as expected by machining a sample part.

This has given a good starting point to begin learning Hypermill and equipped us to start programming on our own with Hypermill support. The training and approach delivered by the AIMS expert met and exeeded our expections. His time proved very valuable to our company.”