Close Menu
 

Equipment

Home ยป Equipment

The AIMS Project equipment is no longer operational. This is due to the AIMS Project coming to an end.

Select the equipment type from the options below

Stratasys F120

Commercial grade polymer 3D Printer

Stratasys F370

Commercial grade polymer 3D Printer

Markforged Mark Two

Commercial grade high strength 3D Printer

Raise 3D Pro 3 Plus

Commercial grade printer capable of using food safe materials

Hexagon Bridge CMM

Equipment that measures the geometry of physical objects

Hexagon Absolute Romer Arm

7 Axis arm with a probe and scan system

Einscan 3D Scanner

Hand held 3D scanner

Leica BLK 360 G2

Next generation imaging laser scanner

Bambu Mini

Entry level hobbyist 3D printer (for courses only)

UR5e

Collaborative robot – works in conjunction with other machinery or an operative (Cobot)

UR10-CB

Collaborative robot – works in conjunction with other machinery or an operative (Cobot)

UR10e

Collaborative robot – works in conjunction with other machinery or an operative (Cobot)

MiR250

Mobile industrial robot (MiR) – autonomous mobile robot for low and high payload tasks

Lorch Welder

MIG & TIG cobot welding robotic system

Kemppi Welder

MIG & TIG cobot welding robotic system

Smooth Tool firmware

User friendly software that simplifies the programming of advanced welds

Akira-Seiki 5 Axis CNC Machine

State of the art 5 Axis vertical machining centre that produces predominantly square parts (milling)

Haubex Automation System

Work holding system for small batches that transform the tool magazine into an automation system

SMEC Lathe

State of the art machining tool that produces round parts in a variety of different materials (turning)

Meta Quest 3

Virtual and augmented reality headset

Soldamatic Welding Simulator

Welding training solution powered by augmented reality