
SMEC Lathe
Home » Equipment – old »
Specifications
| Swing Over the Bed | 680mm |
| Swing Over the Cross Slide | 505mm |
| Max Milling Diameter | 526mm |
| Max Turning Length | 500mm |
| Maximum Turning Length | 1,500mm |
| Chuck Size | 380mm |
| Bore Diameter Thru Spindle | 132mm |


| Swing Over the Bed | 680mm |
| Swing Over the Cross Slide | 505mm |
| Max Milling Diameter | 526mm |
| Max Turning Length | 500mm |
| Maximum Turning Length | 1,500mm |
| Chuck Size | 380mm |
| Bore Diameter Thru Spindle | 132mm |
